Adi Nfas Health Center

A new public health center for Adi Nfas — providing clinical services, maternal care, and community health support.

ApprovedSite preparationStage 2 of 4

Reference visualization of the planned Adi Nfas Health Center compound — central clinic, staff dormitory, public and staff sanitation buildings, waiting home, and underground septic and water systems within the perimeter wall.
Reference maquette visualization derived from the approved project drawings. Explore in 3D

Milestones

  1. Stage 1ApprovedMay 2026
    Approved drawings · May 2026
  2. 2 Stage 2Site prepCurrent stage
    June 2026Open ground at Adi Nfas, the village beyond — before construction begins.Read update
  3. 3 Stage 3ConstructionUpcoming
  4. 4 Stage 4OpeningTo be confirmed

Project funding

Government-funded public project

Community contribution
ERN 1,410,000
Public funding balance
ERN 9,440,000

Based on the documented project estimate

Community contributions from 12 countries

Updating the contribution total…

Components

View all

Documented project estimate

Project cost

ERN 10,844,391.8310 packages · 3 source documents

Cost estimate, not money raised.

Cost breakdown6 groups · 10 packages

Where the cost goes

Tap a slice to see what it includes.

100% documented
Main center blockNew clinical center block. ERN 4,890,636.5345% of estimate
Includes
  • Main center blockERN 4,890,636.53
Boundary and guard houseCompound wall, gates and guard house. ERN 1,967,520.6518% of estimate
Includes
  • Compound wallERN 1,632,793.40
  • Guard houseERN 334,727.25
Staff residenceStaff residence rehabilitation and maintenance works. ERN 1,617,701.2415% of estimate
Includes
  • Staff residenceERN 1,617,701.24
Site service systemsUnderground reservoir, elevated tank, septic tank and electrical works. ERN 1,456,811.1913% of estimate
Includes
  • Underground water reservoirERN 382,444.34
  • Elevated water tankERN 140,560.37
  • Septic tankERN 208,616.48
  • Electrical worksERN 725,190.00
Public toiletsPublic toilet BOQ package. ERN 835,050.028% of estimate
Includes
  • Public toiletsERN 835,050.02
Waste incineratorDedicated waste incinerator package. ERN 76,672.201% of estimate
Includes
  • Waste incineratorERN 76,672.20
Not yet priced

Waiting home

The approved drawings show this scope, but none of the three BOQ scans contains a separate priced waiting-home package.

Excluded from the documented total.
Source documents3 BOQ scans

Main center and staff residence BOQs

Main center on pages 1-4; staff residence on pages 5-8.

Open source PDF
  • Main center blockPages 1-4ERN 4,890,636.53
  • Staff residencePages 5-8ERN 1,617,701.24

Document subtotalERN 6,508,337.77

Public facilities BOQs

Public toilets on pages 1-3; septic tank on page 4; guard house on pages 5-7; incinerator on pages 8-9.

Open source PDF
  • Public toiletsPages 1-3ERN 835,050.02
  • Septic tankPages 4ERN 208,616.48
  • Guard housePages 5-7ERN 334,727.25
  • Waste incineratorPages 8-9ERN 76,672.20

Document subtotalERN 1,455,065.95

Water and site services BOQs

Underground reservoir on pages 1-2; elevated water tank on page 3; compound wall on pages 4-5; electrical works on pages 6-7.

Open source PDF
  • Underground water reservoirPages 1-2ERN 382,444.34
  • Elevated water tankPages 3ERN 140,560.37
  • Compound wallPages 4-5ERN 1,632,793.40
  • Electrical worksPages 6-7ERN 725,190.00

Document subtotalERN 2,880,988.11

The compound-wall scan prints ERN 1,632,793.4; this record preserves that printed total as ERN 1,632,793.40. Its visible section subtotals differ by one cent.

Project details

LocationAdi Nfas, Zoba Maekel, Eritrea
OwnerCommunity of Adi Nfas
DrawingsSee drawings

Help build it

Contributions support the next stage of the health center.

Contribute