ገንዘብ ኣበይ ይውዕል

ጠቕላላ · ERN380,644.34

ነፍሲ ወከፍ ዓይነት ስራሕ ጠውቕ ዝርዝሩ ንምርኣይ

ምሉእ ዝርዝር BOQ
A — Substructure Excavation and Earth Work ERN138,079.05
ItemDescriptionUnitQtyRateAmount
1.01 Clear off site to remove top vegetable or grassy soil to an average depth of 20cm m² 22.45 33.43 750.59
1.02 Excavate in bulk to a depth not exceeding 300cm, starting from natural ground level m³ 77.28 1,538.74 118,913.57
1.03 Back fill around the wall with good and selected excavated material m³ 12.50 319.66 3,995.74
1.04 Cart away surplus excavated material to a distance not less than 1km from site m³ 30.00 235.18 7,055.33
1.05 25cm thick basaltic or equivalent stone hard core, well rolled and blinded to receive ground slab m² 25.76 285.86 7,363.83
Subtotal138,079.05
A — Substructure Concrete Work ERN210,026.47
ItemDescriptionUnitQtyRateAmount
2.01 Lean concrete C-5 150kg/m³, 5cm thick under bottom slab m² 25.76 135.09 3,479.95
2.02a Reinforced concrete C-25 360kg/m³ — in 15cm thick bottom slab m² 25.76 1,116.86 28,770.27
2.02b Reinforced concrete C-25 — in 15cm thick side walls m² 61.20 1,116.86 68,351.73
2.02c Reinforced concrete C-25 — in 15cm thick top slab m² 25.76 1,116.86 28,770.27
2.03a Sawn zigba or steel form work — in 15cm thick top slab m² 20.00 319.12 6,382.49
2.03b Form work — in 15cm thick side walls m² 61.20 319.12 19,530.42
2.04a Reinforcement steel bar — 10mm Kg 790.97 49.33 39,022.30
2.04b Reinforcement steel bar — 8mm Kg 318.62 49.33 15,719.04
Subtotal210,026.47
A — Substructure Finishing Work ERN32,538.82
ItemDescriptionUnitQtyRateAmount
3.01 Three coats of plaster with cement mortar to fine finish — internal surface of side walls, floor and roof m² 184.00 176.84 32,538.82
Subtotal32,538.82

ካብ ዝተወስደ Ministry of Health, Engineering Division — Adi-Nfas Health Center underground water reservoir 50 m³