Adi Nfas Health Center

A new public health center for Adi Nfas — providing clinical services, maternal care, and community health support.

ApprovedSite preparationStage 2 of 4

Open ground at Adi Nfas, the village beyond — before construction begins.
Open ground at Adi Nfas, the village beyond — before construction begins.

Help build it

Contributions support the next stage of the health center.

Contribute

Milestones

  1. Stage 1ApprovedMay 2026
  2. 2 Stage 2Site prepCurrent stage
    Open ground at Adi Nfas, the village beyond — before construction begins.
    May 2026 · June 2026 · 5:57 Clearing the ground and staking out the compound before foundation work begins. Read update
  3. 3 Stage 3ConstructionUpcoming
  4. 4 Stage 4OpeningTo be confirmed

Components

View all

Cost plan

Cost planSee how the documented estimate is allocated · 10 packages · 3 source documents ERN 10,844,391.83

Cost estimate, not money raised.

Where the cost goes

Tap a slice to see what it includes.

100% documented
Main center blockNew clinical center block. ERN 4,890,636.5345% of estimate
Includes
  • Main center blockERN 4,890,636.53
Boundary and guard houseCompound wall, gates and guard house. ERN 1,967,520.6518% of estimate
Includes
  • Compound wallERN 1,632,793.40
  • Guard houseERN 334,727.25
Staff residenceStaff residence rehabilitation and maintenance works. ERN 1,617,701.2415% of estimate
Includes
  • Staff residenceERN 1,617,701.24
Site service systemsUnderground reservoir, elevated tank, septic tank and electrical works. ERN 1,456,811.1913% of estimate
Includes
  • Underground water reservoirERN 382,444.34
  • Elevated water tankERN 140,560.37
  • Septic tankERN 208,616.48
  • Electrical worksERN 725,190.00
Public toiletsPublic toilet BOQ package. ERN 835,050.028% of estimate
Includes
  • Public toiletsERN 835,050.02
Waste incineratorDedicated waste incinerator package. ERN 76,672.201% of estimate
Includes
  • Waste incineratorERN 76,672.20
Not yet priced

Waiting home

The approved drawings show this scope, but none of the three BOQ scans contains a separate priced waiting-home package.

Excluded from the documented total.
Source documents3 BOQ scans

Main center and staff residence BOQs

Main center on pages 1-4; staff residence on pages 5-8.

Open source PDF
  • Main center blockPages 1-4ERN 4,890,636.53
  • Staff residencePages 5-8ERN 1,617,701.24

Document subtotalERN 6,508,337.77

Public facilities BOQs

Public toilets on pages 1-3; septic tank on page 4; guard house on pages 5-7; incinerator on pages 8-9.

Open source PDF
  • Public toiletsPages 1-3ERN 835,050.02
  • Septic tankPages 4ERN 208,616.48
  • Guard housePages 5-7ERN 334,727.25
  • Waste incineratorPages 8-9ERN 76,672.20

Document subtotalERN 1,455,065.95

Water and site services BOQs

Underground reservoir on pages 1-2; elevated water tank on page 3; compound wall on pages 4-5; electrical works on pages 6-7.

Open source PDF
  • Underground water reservoirPages 1-2ERN 382,444.34
  • Elevated water tankPages 3ERN 140,560.37
  • Compound wallPages 4-5ERN 1,632,793.40
  • Electrical worksPages 6-7ERN 725,190.00

Document subtotalERN 2,880,988.11

The compound-wall scan prints ERN 1,632,793.4; this record preserves that printed total as ERN 1,632,793.40. Its visible section subtotals differ by one cent.

Support from 12 countries

Rounded totals in local currencies.

  1. Canada CAD 11,000.00USD 1,000.00
  2. Denmark DKK 12,000.00
  3. Germany EUR 14,000.00
  4. Netherlands EUR 4,000.00
  5. Norway NOK 142,000.00
  6. Saudi Arabia SAR 6,000.00
  7. Sweden SEK 141,000.00
  8. Switzerland CHF 9,000.00
  9. United Kingdom GBP 13,000.00
  10. Other locations3 countries grouped

Updated · 2026-07-10

Project details

LocationAdi Nfas, Zoba Maekel, Eritrea
OwnerCommunity of Adi Nfas
DrawingsSee drawings